Skip to content

Blog

The Log

Everything after the deploy, and the work of building strackt. Technical decisions, product updates, and the unfiltered building journey.

From the archive

RSS

Craft or compulsion

Seven weeks from early access, and I still can't tell where craft stops and can't-let-it-go begins. On details — and the date that makes me choose.

The early devlog lives here now

Four years of building notes from projectstrackt.dev — the original strackt devlog — now live here in The Log. Same story, one place, old links still work.

Month 65

Month 65 of building strackt. CVE patching, self-renewing certs, an installable CLI — the boring month that mattered. And finally a date for early access.

The app is the subject

For a long time the admin was a Filament CRUD panel — honest forms over the data, and it tells you nothing about what matters. So we tore the customer side out and rebuilt it: your app as the subject, the server as supporting cast.

Why I take my time

I don't need strackt to succeed; I've got a job and enough money. I take my time because the standard I'm after — reproducible, right, something you can trust — only comes from the effort nobody sees.

Month 64

Month 64 of building strackt. May built the part you actually touch: a new interface, six ways to order a server, and a try-before-you-bring-your-own on-ramp.

The loop, not the tools

I used to spend my time swapping tools and refining code. Now agents do most of the coding — and most of mine sits on the plan.

Month 63

Month 63 of building strackt. April was a refactor month: 169 issues, 400 commits, an 18-month architectural correction. Progress you only feel looking back.

Adding UI to remove UI

We're adding UI now so we can take it away later. Most server platforms grow knobs forever; most clouds hide everything. We're picking neither.